
CONNEXAFRICA RAIL ROAD TERMINAL
Raid and road terminal. Project Area: 10.000 m2. Location: Kolwezi. Project Period: 2019-2021 ...

EPIROC HEADQUARTERS
Headquarters in Musompo. Location: Kolwezi. Location: Kolwezi. Project Period: 2019-2021 ...

ERG KAKANDA & LUITA
Building for administration and technics offices 800m2 + warehouse of 12.000 m2 + 10 prefabricated ...

INPP KATANGA PROVINCIAL DIRECTORATE
Laying out of the INPP Katanga Provincial Directorate in Lubumbashi. Location: Lubumbashi. Project Period: 2017-2018 ...

KAMOA COPPER MINE
Mine and plant store. Project Area: 10.000 m2. Location: Kolwezi. Project Period: 2020-2021 ...

MMG WORKSHOPS AND FUEL STORAGE
Supply, fabrication and erection of a workshop and 120m³ tanks (fuel storage). Project Area: 4.000 ...

MULYKAP BUS TERMINAL
Modern construction of a bus terminal at the entrance to the city of Lubumbashi including ...

STADIUM TP MAZEMBE
Stadium to FIFA standards, welcoming 21.000 seats. VIP room and locker rooms well-equipped. Location: Lubumbashi ...

TRAFIGURA RAIL ROAD TERMINAL
Fourniture, construction métallique et montage du terminal de la voie ferrée 7000m² + structure pour ...